Entered in the construction of Power stations in the 1930s and in a big way in 1960.
Today, Simplex is one of the largest civil engineering solution providers for power
projects. Simplex holds record in the installation of largest number of Turbo-generator
Foundations ranging from 15MW to 1000MW It has constructed Thermal Power Plants
& Combined Cycle Power Plants from 10MW to 500MW. Simplex is associated with power
projects in all roles - on a turnkey basis or only civil & structural work, from
coal-based to nuclear, gas-based to hydro and oil-based or wind generators.
Simplex have long association for construction of structures, pile foundations and
associated work for transmission line. It is also fulfilling challenging requirements
of power plants including construction of main plant, boiler and auxiliaries and
construction of 400 KV GIS building and switch yards.Presently executing construction
of 400 KV D/C Transmission Line for M/s. Adani Power of total line length from Mundra
to Zerda is 330kms.
|